The Eight Wastes of Lean (TIMWOODS)

Carl Trigg  ·  October 2026  ·  9 min read  ·  Free calculator

In lean thinking, waste (the Japanese word muda) is anything that takes time, effort or money without adding value the customer would pay for. Taiichi Ohno, the engineer behind the Toyota Production System, described seven types of waste. An eighth, unused skills, was added later as lean spread beyond Toyota. Together they are often remembered as TIMWOODS.

The list was written for factories, but every small business has all eight. The value of the list is that it gives you something specific to look for.

TTransportIInventoryMMotionWWaitingOOver-productionOOver-processingDDefectsSSkills
TIMWOODS: a common way to remember the eight wastes.

The eight wastes, with small-business examples

WasteWhat it meansSmall-business example
TransportMoving materials, stock or paperwork more than neededTwo trips to the merchant for one job
InventoryStock or work sitting idleVan stock nobody uses; quotes waiting to be typed
MotionPeople moving more than neededWalking to the printer; searching a shared drive
WaitingPeople or work waiting for somethingWaiting for parts, a decision, site access or a reply
Over-productionDoing work before it is neededReports nobody reads; batches made just in case
Over-processingMore effort than the customer valuesThree sign-offs on a small purchase
DefectsWork that has to be done againCallbacks, wrong invoices, rework
SkillsPeople's abilities going unusedA qualified engineer doing data entry

Transport and motion are easy to confuse. Transport is about moving things; motion is about people moving their bodies, such as walking, reaching and searching.

Why waiting and defects matter most

In most service and trade businesses, waiting and defects cost the most. Waiting is invisible on a timesheet because people are still being paid while they wait. Defects are paid twice: once when the job is done badly and again when it is put right, often with travel on top.

Estimate what waste costs you

Estimate how many hours each waste costs a typical person each week. Rough figures are fine for a first pass. The calculator turns them into an annual cost and ranks the wastes, so you know where to start.

Waste Cost Estimator

The default figures are an illustration: five people each losing seven hours a week to waste, at £25 an hour, comes to 1,380 hours and £34,500 a year. That is 1,380 ÷ (37.5 × 46) = 0.8 of a full-time person.

How to run a waste walk

  1. Pick one process, for example a standard job from booking to invoice.
  2. Follow one real job through it. Watch, ask and note every step. Do it openly, with the people involved.
  3. Tag each step with the waste it shows, if any. One step can show more than one.
  4. Count or time the biggest two. Replace your estimates with measured figures: minutes waiting, number of callbacks, trips to the merchant.
  5. Fix one cause this month, then measure again.

An activity-sampling week, where people note what they are doing every 15 minutes, is a good way to measure waiting and motion without stopwatches. The time and motion study guide explains how.

Sources

Put This Into Practice

Free Excel templates for time studies, debtor days and staff costs. Enter your email once and download them all.

Get the Free Templates →

Want an independent view of your own numbers? See the Diagnostic Assessment.